Shear Walls on F1
|
North Wall along Ridge Road
|
First Columns (Feb.13)
|
First Girders (Feb.13)
|
Much More Steel (Feb.14)
|
|
|
|
|
|
2nd Story Girders (Feb.15)
|
Battling the Braces (Feb.16-18)
|
First Floor Decking & Railing
|
Roof Beams (Feb.16-18)
|
Topping Out (Feb.19-20)
|
|
|
|
|
|
Plumblining, Welding (March)
|
Lower Deck (March 19)
|
Upper Deck (March 30)
|
Walk-through (April 4)
|
More Concrete (April 11)
|